Outside the city limits, Dawson County Community Development issues plumbing permits under a fee schedule that took effect August 1, 2026.

  • Residential MEP (trade) permit$50.00 plus $10.00 per added 1,000 sq ft over 1,000Source
  • 1st re-inspection$100.00Source
  • Additional re-inspections$50.00Source
  • Fee schedule effectiveAugust 1, 2026Source

Adopted utility rates and government fees, not plumber prices.

The County requires a plumbing permit for a water heater replacement and for lawn sprinkler supply, not just for new piping.

What the County requires a permit for

Dawson County's building permits page lists a plumbing permit as required to install, alter, reconstruct or repair any plumbing system, gas system or lawn sprinkler supply, and for water heater replacement. That is broader than many homeowners expect: the sprinkler supply and the water heater are both named. Mechanical permits are separate, covering furnaces and air conditioning.

The fees

The County's Community Development Fee Schedule, effective August 1, 2026, sets a residential MEP, or trade, permit at a base amount plus a per-thousand-square-foot amount above the first 1,000 square feet. Residential additions, alterations and repairs carry a per-square-foot fee with a minimum. The first re-inspection costs more than later ones, and construction before permit issuance is charged double. A residential building permit also carries a separate administrative fee.

Dawson County residential permit fees that apply to plumbing work (Community Development Fee Schedule, effective August 1, 2026)
Fee typeAmountSource
MEP (trade) permit, residential$50.00 plus $10.00 for each additional 1,000 sq ft over 1,000 sq ftDawson County fee schedule eff. 8/1/26
Administrative fee (in addition to a residential building permit)$50.00Dawson County fee schedule eff. 8/1/26
Residential additions, alterations or repairs$0.33 per sq ft ($50.00 minimum)Dawson County fee schedule eff. 8/1/26
1st re-inspection$100.00Dawson County fee schedule eff. 8/1/26
Additional re-inspections$50.00Dawson County fee schedule eff. 8/1/26
Construction before permit issuanceDouble permit feesDawson County fee schedule eff. 8/1/26
Source: Dawson County, GA: Community Development Fee Schedule, effective August 1, 2026 (PDF)

Know the adopted rates and the permit rules, then let an independent local plumber price the work.

Call (706) 807-8059

Other items you may run into

Pools and spas, temporary power, renewals and extensions each have their own line. Manufactured homes are charged by square footage plus an electrical fee, with no separate plumbing or mechanical permit.

Other Dawson County permit items homeowners ask about
Fee typeAmountSource
Pool, residential or commercial$250.00 plus $50 per MEP (trade) feeDawson County fee schedule eff. 8/1/26
Temporary power$50.00Dawson County fee schedule eff. 8/1/26
Permit renewal within 12 months$300.00Dawson County fee schedule eff. 8/1/26
Permit extension within 12 months (180-day max)$150.00 per extensionDawson County fee schedule eff. 8/1/26
New manufactured home$0.33 per sq ft plus $50.00 electrical fee; no separate plumbing permitDawson County fee schedule eff. 8/1/26
Source: Dawson County, GA: Community Development Fee Schedule, effective August 1, 2026 (PDF)

Applying

The County's page says residential permit applications must be complete, including an application form, a project plan, proof of ownership, a site plan and a copy of the contractor's license where applicable; partial applications cannot be processed. There is a minimum four-day review period for complete residential applications, with the status sent by email. The County lists a Mechanical or Plumbing Permit Application among its documents, and permits and fees can be paid through its Citizen Self Service portal.

Inspections

The County takes inspection requests by email to its Planning and Development inspection address and says inspections are typically performed within 72 hours of the request. Today's inspections are visible on its self-service portal. Plan the job so the work is ready and accessible when the inspector arrives; the first re-inspection is the most expensive one.

Other agencies on the same job

The County's page lists the other contacts a project may need: Etowah Water for public water and sewer, Environmental Health for on-site septic, and the Fire Marshal for commercial work. For digging, Georgia 811 must be contacted so buried utilities are marked first.

Worked example: a trade permit fee

The County's trade fee is a base amount that covers the first 1,000 square feet, plus a per-thousand amount for each additional 1,000 square feet. For a water heater replacement in an existing house, ask the County how it measures square footage for the trade fee, since the schedule does not say whether it uses the whole house or the affected area. Then add any applicable administrative fee. Ask the plumber whether the fee is already in the quote. If two quotes differ, the permit is one of the first things to compare.

For an addition or alteration, the per-square-foot fee applies to the area of work, with a minimum, and trade permits for plumbing, mechanical and electrical are added as applicable.

Renewals, extensions and expired permits

Permits do not last forever. The County's schedule lists a renewal within 12 months, an extension within 12 months for up to 180 days, and a full new permit after expiration, less any impact fees already paid. For a homeowner, the lesson is to finish permitted work, or at least keep inspections moving, so a permit does not lapse. A remodel that stalls for a year can end up costing a renewal or a full re-permit on top of the original fee.

What the County does not handle

The County building office does not issue septic permits, which come from Environmental Health, and does not set water or sewer rates, which come from the utility. It does coordinate with those agencies through its list of local contacts. If your project involves a new tap or a septic system, start those conversations early, because they can take longer than the building permit.

Inspections the County expects

Plumbing inspections follow the work. New piping in a slab is inspected before concrete; piping in walls and floors is inspected at rough-in before it is covered; the finished system is inspected at final. For a water heater replacement, a single final inspection is typical, but ask. Make sure someone can give the inspector access, and that the work is complete and tested when the request is sent. Because the first re-inspection costs more than the permit's own base fee, a failure is expensive in money as well as time.

The County's self-service portal shows each day's inspections, so you can check when yours is on the schedule.

County permit checklist

Confirm the parcel is outside city limits. Confirm whether the job needs a plumbing permit; in the County, water heater replacements and sprinkler supply do. Ask the contractor to include the permit in the price. Submit a complete application. Request inspections by email and be ready. Keep the final approval with your property records. Inside the city, use the City permit article.

Sources for this article: Dawson County, GA: Building Permits; Dawson County, GA: Community Development Fee Schedule, effective August 1, 2026 (PDF); Georgia 811; Georgia Secretary of State: Division of Master and Journeyman Plumbers FAQ. Checked 2026-10-29.

Describe the problem once. Independent plumbers who work in Dawson County can follow up.

Call (706) 807-8059

In brief

Does a water heater replacement need a permit in Dawson County?

Yes. The County lists water heater replacement among the work requiring a plumbing permit.

What is the County trade permit fee?

$50.00 plus $10.00 for each additional 1,000 sq ft over 1,000 sq ft, effective August 1, 2026.

How fast are inspections?

The County says typically within 72 hours of the request.